Certifications and compliance scope
Certificate copies and model-specific test reports are released under NDA before order confirmation. Where a market requires a local mark, we supply the underlying test documentation so your importer can complete registration.
Frequently asked questions about Ruihan
When was Ruihan founded, and where is manufacturing located?
Ruihan was founded in 2018 and manufactures in a single facility in Guangzhou, Guangdong. Keeping inverter assembly and battery pack assembly under one roof is what allows us to supply a matched inverter-and-battery system rather than two components sourced separately.
What is your production track record?
Our systems have accumulated more than 500 MW of installed capacity across residential storage, commercial and industrial cabinets, and portable power stations, backed by 8+ years of in-house R&D on battery management and inverter control.
What documentation ships with each order?
Every shipment includes a commercial invoice, packing list, and a model-specific test report. UN38.3 transport reports accompany battery shipments, and certificate copies for UL 9540A, UL 1973, IEC 62619, CE and RoHS are provided per model on request.
How does the OEM / ODM process run?
OEM starts at 100 units per model with your logo, enclosure colour, packaging and manual. ODM with custom firmware parameters starts at 300 units and adds 15–20 days of engineering lead time. Artwork approval happens before production, and bulk runs take 25–30 days after deposit.
What warranty and support terms apply?
Standard warranty is 5 years on inverters and 10 years on LiFePO4 packs. Distributors receive spare-part kits, and our engineers return system sizing — load profile in, single-line diagram and bill of materials out — usually within 2 working days.
How we work with distributors
Distributor engagements follow five steps. First, we map your market grid profile — 120/240 V split phase for North America, 230/400 V for Europe and CIS — because enclosure, connector and firmware variants differ by region. Second, we agree the model mix and the certification documentation your importer needs. Third, artwork and firmware approval happens before any production slot is booked.
Fourth, production runs 25–30 days after deposit, with a pre-shipment inspection report issued before the container is sealed. Fifth, spare parts and firmware updates continue for the warranty term, and we keep a service record per serial number so recurring field issues surface early rather than after the customer complains.
Certification references: UL Solutions · IEC 62619:2022 · IEA — Batteries and Secure Energy Transitions (2024)
Reviewed by the Ruihan engineering team · Last updated October 2026
Factory or trading company: what actually changes
Most buyers comparing quotes are not comparing prices, they are comparing two different supply models without noticing. The table below sets out where the difference shows up after the purchase order is signed.
| Point of comparison |
Buying from the factory (Ruihan) |
Buying through a trading company |
| Who builds it | Inverter assembly and LiFePO4 pack assembly on our own line in Guangzhou - one supplier accountable for both halves of the system | One or more contract factories, often for the inverter and the battery separately |
| Engineering changes | Firmware and BMS parameters adjusted in-house; ODM adds 15-20 days of engineering lead time | Request is relayed to the factory; timing and feasibility depend on a third party |
| Certification paperwork | Test reports held per model (UL 9540A, UL 1973, IEC 62619, UN38.3) and released with the quote, some under NDA | Certificates may sit with the factory rather than the seller, and model-level reports can be hard to obtain |
| Minimum order | OEM from 100 units per model, ODM with custom firmware from 300 units | Often the factory minimum plus the seller's margin, or resale of existing stock only |
| Defect handling | Service record kept per serial number, spare-part kits supplied with distributor orders | Claim is routed back to the factory, so root-cause feedback slows down and repeats go unnoticed |
| Lead time | 25-30 days after deposit, with a pre-shipment inspection report before the container is sealed | Depends on the factory queue and on how much visibility the seller actually has into it |
| Warranty | 5 years on inverters, 10 years on LiFePO4 packs, honoured by the manufacturer that built the unit | Honoured through the seller, so continuity depends on that company still being there in year eight |
The comparison describes the two supply models, not any named competitor. Where a trading company adds real value - consolidating several product lines, local stock, faster documentation - the table does not apply, and we say so rather than pretend otherwise.